Fan and blower motor calculator
Any fan or blower: from the air flow and the total pressure, the air power, the shaft power and the motor to install, in kW and HP.
What you enter
- Air flow, typical 20,000 m³/h
- Total pressure, typical 1500 Pa
Under Advanced, 2 more inputs for a closer answer, each set to a typical value until you change it: Air temperature 35 °C; Fan efficiency 65 %.
What it works out
- Motor
- Shaft power
- Air power
- Pressure
- Air density at 35 °C
- Mass flow
- Power at the same speed if the air were at 20 °C
How it works
Shaft power = flow × total pressure ÷ efficiency; the motor is the next standard rating above the shaft power, plus the extra margin you choose. SHIVAS Reinplast makes FRP and PP blowers for corrosive fume.
Each size it picks (a motor, burner, rectifier or fan) is the next standard size above the calculated need. Choose an extra margin of 10, 20 or 30 % and it is added to the need before the size is picked; nothing else is added.
The answer is a first sizing from typical values, and every input can be changed. Press Ask our engineer to check this under the results and SHIVAS replies with a checked sizing and a proposal.
The equipment it sizes
The same calculator is on each of these pages.
From our engineers
- Acid fume from pickling: hoods, the packed scrubber and the blowerHydrochloric acid fume corrodes everything it touches, starting with the building. How a SHIVAS Reinplast system captures it at the tank and washes it out
- Zinc fume extraction: enclosure, air and the bag filterThe white cloud over a galvanizing kettle is flux fume. Catching it well depends far more on the enclosure than on the size of the fan. How to design the w
Other calculators
- Galvanizing plant calculatorKettle, furnace, zinc, fuel and cost per tonne from your steel and tonnage.
- Electro-galvanizing rectifierCurrent, current density and rectifier size
- Wire drawingPasses, die sequence, block speeds, kW and output
- High-velocity burner kWFiring rate, burners, wall heat flux, fuel
- ETP and ZLD plantNeutraliser, sludge, RO, MEE or MVR, ATFD, steam and power
- Coating thickness checkISO 1461 minimums, g/m², zinc per tonne
- Inline phosphating lineBath length, coating time, phosphate and output
- Fume scrubber + blowerAir flow, tower size, packing, pump, blower kW and HP
- Pickling acidAcid use, spent acid, tank charge
- Spent acid neutralisationLime, filter cake and dissolved salt
- Bag filterCloth area, bags, housing, fan kW and HP
- FRP profile weight and deflectionkg per metre, steel comparison, beam check